printout House: Anan, Tokushima

Asset type
House
Yield
61.8%
Rank
★★☆☆☆
To the bid due58 days left

Property image

*Image may not be accurate; please download and check Tri-set for property photos.

MAP

Property URL

Base bid price 1,480,000yen You can bid above 1,184,000yen
To the bid due 58 days left

Location

Location Anan, Tokushima
Traffic access on report(japanese) JR牟岐線「見能林」駅 東方 道路距離 約2.3km 最寄りバス停「北ノ脇東」 北方 約170m
Reference(japanese) JR牟岐線 阿南駅 南東方 2.83km

Property data

Type Land(Farm) Property number 4
Registered category Rice field Actual category -
Registered area 514m2 Actual area -
Zoning Preserved Usage -
Building to land ratio 70% Floor area ratio 200%
Type Land(Farm) Not for saleYes Property number 7
Registered category Rice field Actual category Farm(Greenhouse敷地)
Registered area 406m2 Actual area -
Zoning Preserved Usage -
Building to land ratio 70% Floor area ratio 200%
Type Land Property number 8
Registered category Residential land Actual category -
Registered area 97.99m2 Actual area -
Zoning Preserved Usage -
Building to land ratio 70% Floor area ratio 200%
Type Land Property number 10
Registered category Rice field Actual category Other land
Registered area 42m2 Actual area -
Zoning Preserved Usage -
Building to land ratio 70% Floor area ratio 200%
Type Land(Farm) Property number 11
Registered category Farm Actual category -
Registered area 48m2 Actual area -
Zoning Preserved Usage -
Building to land ratio 70% Floor area ratio 200%
Type Building Property number 15
Building number 2-5
Registered type Warehouse Actual Warehouse・Workshop
Registered structure steel structuredFlat-roofed2F building Actual -
Registered floor area 1F 69.00m2,2F 48.00m2 Actual -
Layout Others Land right Ownership
Occupant debtor・owner Year/month built 1987/10

Numerical data

Cap rate 61.8% Area 117㎡
Gross yield 85.0% Base bid price 1,480,000yen
Lease demand 10 / 25pt Minimum bid price 1,184,000yen
Ratio of years passed
to depreciable years
144% Earnest money deposit 296,000yen

Court data

Case number 2023(M)28 Announced 2024/04/09
Court Tokushima District Court (Main) Start of viewing 2024/04/09
Sale type Sealed bid auction (1 times) Bid period 2024/07/04 ~ 2024/07/10
Farm land Result 2024/07/17
Sale decision 2024/08/07 Special sale 2024/07/18 ~ 2024/07/19
Download Property PDFregister favorite auction concierge Contact / Bidding supportproperty request form (free consultation)

Save your estimate winning bid and memo

Virtual bidding Registered 0properties please login.

AI bid price forecast

AI bid price forecast Pro Calculations are based on past performance of nearby properties. Reference data for calculation member-only yen

Search similar properties

Search similar properties Pro Basic List of similar properties nearby and sold out List of similar props.
Points to note

Property price for assets not on court auctions does not include miscellaneous purchase expenses of about 7.5%.

Thus buying the asset at 1480000yen in court auction is the same as buying the asset out of court auction at 1380000yen(excluding misc. expenses).

In foreclosed properties, expenses for purchasing differ from ordniary purchase. Generally, however, it takes about 30%, depending on location and asset, in intermediary margins. Court auction is the sole market in which general public can eliminiate this margin.

For the same money, one can acquire better quality in foreclosed properties: auction concierges of 981.jp provide useful assistance.

*Above figures are based on base bid prices. For actual total costs, see 「bid simulation」.

Others show interests in properties below also

Bid simulation ※click hear

Estimate the total costs here

Simulate the total cost of acquisition

Bid 0,000yen Support service 0,000yen
Registration tax 0,000yen Liabilities 0,000yen
Eviction etc. 0,000yen Renovations 0,000yen
Others 0,000yen
Input the desired price, calculate the acquisition cost
Calculation result↓
Total cost of acquisition 0,000yen

Simulate return from the asset

Rental income 0,000yen Upkeep costs 0,000yen
Calculte estimated return from the total cost
Calculation result↓
Projected yield %