printout House: Kurayoshi, Tottori

Asset type
House
Yield
26.5%
Rank
★★☆☆☆
To the bid due15 days left

Property image

*Image may not be accurate; please download and check Tri-set for property photos.

MAP

Property URL

Base bid price 2,120,000yen You can bid above 1,696,000yen
To the bid due 15 days left

Location

Location Kurayoshi, Tottori
Traffic access on report(japanese) JR山陰本線 倉吉駅 南西方 約3.3km(道路距離) 住吉町バス停 南方 約110m(道路距離)
Reference(japanese) -

Property data

Type Land Property number 1
Registered category Residential land Actual category -
Registered area 6.00m2 Actual area -
Zoning Residential Class I Usage -
Building to land ratio 60% Floor area ratio 200%
Type Land Property number 2
Registered category Residential land Actual category -
Registered area 44.68m2 Actual area -
Zoning Residential Class I Usage -
Building to land ratio 60% Floor area ratio 200%
Type Land Property number 3
Registered category Residential land Actual category -
Registered area 96.38m2 Actual area -
Zoning Residential Class I Usage -
Building to land ratio 60% Floor area ratio 200%
Type Building Property number 4
Building number 68-3
Registered type Apartment・Garage Actual Workshop・Garage
Registered structure Lightsteel structuredConcrete blockFlat-roofed2F building Actual Lightsteel structuredConcrete blockZinc-coated steel sheetroofedOne-story
Registered floor area 1F 88.55m2,2F 89.94m2 Actual 88.55m2
Layout Others Land right Ownership
Occupant debtor・owner Year/month built 1965/02
Type Building Property number 5
Building number 68-4
Registered type Shop Actual -
Registered structure steel structuredZinc-coated steel sheetroofed2F building Actual -
Registered floor area 1F 25.28m2,2F 20.00m2 Actual 1F ca.34m2,2F ca.23m2
Layout Others Land right Ownership
Occupant debtor・owner Year/month built 1982/03

Numerical data

Cap rate 26.5% Area 88㎡
Gross yield 36.4% Base bid price 2,120,000yen
Lease demand 9 / 25pt Minimum bid price 1,696,000yen
Ratio of years passed
to depreciable years
161% Earnest money deposit 424,000yen

Court data

Case number 2024(M)1 Announced 2024/05/14
Court Tottori District Court (Main) Start of viewing 2024/05/14
Sale type Sealed bid auction (1 times) Bid period 2024/06/04 ~ 2024/06/11
Farm land - Result 2024/06/13
Sale decision 2024/07/03 Special sale -
Download Property PDFregister favorite auction concierge Contact / Bidding supportproperty request form (free consultation)

Save your estimate winning bid and memo

Virtual bidding Registered 0properties please login.

AI bid price forecast

AI bid price forecast Pro Calculations are based on past performance of nearby properties. Reference data for calculation member-only yen

Search similar properties

Search similar properties Pro Basic List of similar properties nearby and sold out List of similar props.
Points to note

Property price for assets not on court auctions does not include miscellaneous purchase expenses of about 7.5%.

Thus buying the asset at 2120000yen in court auction is the same as buying the asset out of court auction at 1970000yen(excluding misc. expenses).

In foreclosed properties, expenses for purchasing differ from ordniary purchase. Generally, however, it takes about 30%, depending on location and asset, in intermediary margins. Court auction is the sole market in which general public can eliminiate this margin.

For the same money, one can acquire better quality in foreclosed properties: auction concierges of 981.jp provide useful assistance.

*Above figures are based on base bid prices. For actual total costs, see 「bid simulation」.

Others show interests in properties below also

Bid simulation ※click hear

Estimate the total costs here

Simulate the total cost of acquisition

Bid 0,000yen Support service 0,000yen
Registration tax 0,000yen Liabilities 0,000yen
Eviction etc. 0,000yen Renovations 0,000yen
Others 0,000yen
Input the desired price, calculate the acquisition cost
Calculation result↓
Total cost of acquisition 0,000yen

Simulate return from the asset

Rental income 0,000yen Upkeep costs 0,000yen
Calculte estimated return from the total cost
Calculation result↓
Projected yield %